Introduction
In any industrial plant, the question that every financial director, controller or operations manager eventually asks is the same: how much does it cost me to manufacture one unit of this product? And the answer almost always depends on a variable that many people are unaware of: the standard time of manufacturing.
Time Study is not just a methods engineering tool for calculating an operator's workload or detecting inefficiencies. Above all, it is the objective foundation on which the company's standard cost system is built. Without reliable standard times, unit costs are estimates; with them, they are auditable, comparable figures that are useful for making pricing, make-or-buy and continuous improvement decisions.
In this article we will look at how to convert standard time (in minutes or hours) into a unit standard cost (in euros or dollars), which cost components that time absorbs, which formulas are used in industrial practice, and which common mistakes ruin the calculations. We will also present a complete case with real data so that you can replicate it in your plant.
Want to calculate the standard cost of your products from timed observations? Request a Cronometras Demo and discover how Cronometras generates standard times ready to be integrated into your costing system.
1. From timed observation to unit cost: the value chain
The logical flow is always the same:
- Time the process (observed time $T_o$).
- Rate the operator's performance (pace factor or rating $R$).
- Calculate the normal time: .
- Apply allowances per ILO (rest, contingencies, fatigue): , where is the sum of allowances as a decimal fraction.
- Obtain the standard time (in minutes or seconds per unit).
- Multiply by the hourly rate of the resource: .
Standard time is therefore the bridge between physical work and money. If the first link fails, all the others collapse: a 10 % error in the stopwatch translates into a 10 % error in the unit cost, which in long production runs can mean hundreds of thousands of euros per year.
2. Cost components absorbed by standard time
When we time a process, what we are measuring is the consumption of resources per unit produced. That consumption translates into cost through three main blocks:
2.1 Direct labor cost (MOD)
This is the most intuitive one: what the operator earns (plus social charges) for the time it takes to manufacture one unit.
where:
- = standard time in minutes per unit
- = gross hourly wage of the operator (€/h)
- = social charges coefficient (typically 0,25 to 0,35 in Spain; 0,30 to 0,45 in Latin America)
Example: if min, €/h, :
2.2 Machine cost (depreciation + energy + maintenance)
In a time study with a man-machine chart, we distinguish machine time from operator time. The former is charged to the product via the machine hourly cost:
where:
- = machine time consumed per unit (min)
- = annual depreciation of the machine (€)
- = annual energy cost (€)
- = annual maintenance cost (€)
- = annual useful hours of the machine (h)
Example: min, €, €, h/año:
2.3 Manufacturing overhead costs (CIF / Overhead)
Here all costs that are neither MOD nor direct machine cost are allocated: supervision, quality, internal logistics, consumables, plant rent, etc. They are typically allocated as a percentage of MOD or as a plant hourly rate (€/h of MOD).
where is obtained from cost accounting (€/h of MOD consumed). In the metalworking industry it usually ranges between 1,5 and 2,5 times the MOD rate.
3. General formula for unit standard cost
Adding the three components:
In practice, companies work with an integrated hourly rate ($Tarifa_{int}$, in €/h) that already combines MOD, machine and overhead:
Complete example with min, min, €/h, , machine cost 0,0925 €/min, overhead rate = 12 €/h MOD:
| Component | Calculation | Cost (€/ud) |
|---|---|---|
| MOD | 3,64 | |
| Machine | 0,83 | |
| Overhead | 2,40 | |
| Total | 6,87 |
To this, the material cost (raw material + components) would have to be added, which does not depend on standard time but on the BOM (Bill of Materials).
4. Practical case: calculating the standard cost of a machined part
Let us imagine a part manufactured on a CNC machining center. The time study data produced the following results (measured with a snap-back stopwatch, 30 cycles):
| Element | Observed time (s) | Rating | Normal time (s) | Allowance |
|---|---|---|---|---|
| Clamping the part | 18 | 100 | 18 | 12 % |
| Machine cycle (CNC) | 240 | 100 | 240 | 8 % |
| Deburring and inspection | 25 | 95 | 26,3 | 12 % |
| Loading next blank | 15 | 100 | 15 | 12 % |
Applying :
- Clamping: s
- CNC: s
- Deburring: s
- Loading: s
Total standard time: s min/unidad
Integrated plant hourly rate: 48 €/h (MOD + machine + overhead)
Unit standard cost (conversion only): €/ud
Material cost (steel + inserts + fasteners): 12,50 €/ud
Total standard cost: €/ud
If the part has a target margin of 30 % on cost, the minimum selling price should be €/ud.
5. Common mistakes that ruin the calculation
5.1 Confusing normal time with standard time
This is the most frequent mistake. An efficient operator rated at 110 % with min gives min, but if we forget the allowances (12 %), min. A plant that only uses in its costing system is systematically underestimating its costs by between 10 % and 25 %.
5.2 Using outdated historical times
A standard time from 2019, when the installation was new, ceases to be valid when the machine wears out, a tool is changed or the tooling is modified. Periodic review (semiannual or annual) is part of the standard cost system, not a luxury.
5.3 Forgetting machine cost
Many costing systems only allocate MOD and forget depreciation, energy and maintenance. In automated processes, the machine accounts for between 40 % and 70 % of the cost; ignoring it completely distorts make-or-buy decisions.
5.4 Allocating overhead on an incorrect basis
Allocating overhead equally among products, or by volume, or by number of orders, leads to cross-subsidies between references. The correct basis is usually the MOD hour or the machine hour, depending on the process.
5.5 Not distinguishing operator time from machine time
In a process with one operator tending 3 machines, the operator time per unit is , but the machine time per unit is the full . If MOD is allocated on instead of on , the product is being charged three times the labor.
6. Integration with the company's costing system
The standard time generated in Cronometras can be exported directly to Excel (see [Export Time Studies to Excel and PDF with CronometrasApp]) and from there feed:
- ERP (SAP, Dynamics, Oracle, etc.) in the Routing and Costing modules.
- Standard cost sheets with periodic updates.
- MES systems that calculate actual cost and compare it with the standard (variance).
The cost variance (actual cost − standard cost), together with OEE (see [OEE Calculation in Production Lines]), is one of the two major indicators of industrial health. If the variance spikes, the standard time has become obsolete or there is a deep operational problem.
7. Standard cost and decision-making
A good standard cost system based on timed observations supports critical decisions:
7.1 Make-or-buy decisions
If producing in-house costs 16,84 €/ud and an external supplier offers 14,00 €/ud, subcontracting looks profitable. But the following must be added:
- Transport and stock cost (≈ 0,60 €/ud)
- Quality cost (≈ 0,40 €/ud)
- Opportunity cost of the freed-up capacity
Subcontracting stops being profitable below 17,84 €/ud. Standard time is the basis of that calculation; without it, the decision is pure gut feeling.
7.2 Pricing and profitability per product
With the unit standard cost, a profitability matrix (absolute and percentage margin per reference) can be built to identify the "cash cows", the "dogs" and the price re-skilling opportunities.
7.3 Budget and forecast
Expected annual revenue is calculated as:
If the are reliable, this figure is defensible before a management committee or a bank.
8. How Cronometras helps in calculating standard cost
Cronometras is designed so that standard time reaches the costing system "clean", without having to re-time or reinterpret data. The key features are:
- Snap-back and cumulative stopwatch with hundredths-of-a-second accuracy.
- Voice input (see [Voice Input in Time Studies with CronometrasApp]) so that the analyst does not waste time typing on the shop floor.
- Integrated performance rating (pace factor, Bedaux scale or centesimal scale).
- ILO allowances preconfigured and editable (see [ILO Allowance Tables: Fatigue and Rest Calculation]).
- Reusable element libraries (see [Element Library: Time Standardization]) that standardize across plants, lines and shifts.
- Export to Excel and PDF in formats ready for the costing department.
- Collaborative work so that several analysts can share and review data collection templates (see [Collaborative Work in Methods Engineering: Organizations]).
9. Conclusion
The standard cost per product is not an isolated accounting exercise: it is the direct consequence of a good Time Study. When standard times are reliable, the costing system stops being an estimate and becomes a management tool that supports pricing, subcontracting, investment and continuous improvement decisions.
The keys to a robust system are:
- Measure well: accurate stopwatches, performance rating, ILO allowances.
- Update periodically: the standard is not forever.
- Distinguish operator and machine: in automated processes, the machine is the main cost.
- Integrate with the ERP: the data must reach production, purchasing and finance.
- Compare actual vs standard (variance) as an indicator of industrial health.
Plants that master this chain have a quiet but decisive competitive advantage: they know exactly how much each product costs them, and can therefore decide with data instead of intuition.
Ready to take your standard times into your company's costing system? Request a Cronometras Demo and see how our data integrates directly with your ERP.
Did you like this article? Share it with your costing manager or controller. At Cronometras we believe that well-measured time is well-accounted money.
Don't want to do it yourself? We do it for you from €800
If you prefer to outsource it, Cronometras delivers a complete time and motion study from a single video: elemental breakdown, OIT/TAL fatigue allowances, standard time with tolerances, and a report in PDF + Excel + JSON ready to present to management.